Project information.

  • Sector Education
  • ClientMedway Council
  • LocationRochester
  • Value£2.5m

The project.

The primary school was recently completed and handed over for the start of the Autumn Term 2023.

The primary school underwent a two-storey expansion creating a seamless continuation from the existing buildings to the newer spaces.

Works included providing 8 new classrooms and associated amenities for the students. The school’s existing early years outdoor play area was relocated to provide a newer facility for the children to enjoy. The existing car park has been reconfigured to allow for safer drop offs whilst also creating another entrance – helping with the busyness on the main road. Uniquely, one of the main ways that the school is heated is by the exposed pre-cast concrete floors that absorb and manage heat.

Despite these obstacles, we were able to deliver above and beyond and we’re proud to say that we were a part of this journey.  A massive well done to all those involved, and we hope to see the students enjoy the spaces we helped to create.

It was a pleasure to be involved in an excellent project providing a much needed expansion to an existing Primary School in Hoo to meet the local demand. The high levels of collaboration between all project parties enabled the scheme to be handed over on time for the new term in a challenging geographical and economic environment” – Dom Mulford